Construction Supervision of the Upgrading of Nyakaita- Kazo Road

Project Name:

Call order No. 4
Construction Supervision of the Upgrading of Nyakaita- Kazo Road

Country:

Uganda

Project Location within Country:

Western Uganda

Professional Staff Provided by our Company:

Deputy Resident Engineer/Measurement Engineer, , Environmentalist, Surveyor, Senior Road Inspector, Senior Material Technician

Name of Client:

Uganda National Roads Authority (UNRA)

No. of staff:

3

Address of Client:

P.O.Box 24847 Kampala Uganda

No. of Man - Months:

36

Start Date (month/year)

January 2011

Completion Date (month/year)

December 2013

Approx. Value of Services/Financing Agency:

US$ 820,000

Names of Associated Firm(s) if any:

JBURROW of South Africa

No. of Man-Months of Professional Staff Provided by Associated Firm(s):

80

Positions of senior staff involved:

  • Deputy Resident Engineer/Measurement Engineer Eng. Gerald Musoke 
  • Environmentalist, Dr. C. Koojo 
  • Surveyors ,Stanly Mugenyi

Detailed Narrative Description of Project:

Consultancy Services for supervision of road upgrading construction works of Nyakaita-Kazo Road:
  • Upgrading of the existing gravel road 
  • Improving of the existing horizontal and vertical alignments and Widening of the existing road  
  • Construction of soil and rock embankments 
  • Lengthening or replacement of existing culverts and Construction of slab culverts and box culverts 
  • Construction of gabion, drainage ditches, drainage structure and other protection works

Detailed Description of Actual Services provided by our Company:

  • Selection of alignment and Design Standards 
  • Detailed Topographical Surveys 
  • Materials Investigations 
  • Hydrological Investigations and Hydraulic Design 
  • Environmental, social and Economic Impact assessments 
  • Cadastral Surveys and Property Valuation 
  • Traffic and Axle load survey 
  • Preparation of Reprioritisation Reports, Preliminary Engineering Designs, Detailed Engineering Designs, Bidding Documents, Environmental Impact Assessments, Resettlement Action Plan.