Frame work contract for provision of Road engineering consultancy services for detailed engineering designs of roads in Rubaga and Kawempe division, and an assessment to ascertain the required maintenance of Kisaasi Kyanja road in Nakawa Division

Project Name:

Call order No. 4
Frame work contract for provision of Road engineering consultancy services setting out/establishment of road extents and channel reserves for specific roads(Makere hill road, Mambule road, Kira road and Hoima roads) and drainage channels( Nalukolongo and Primary drains).

Country:

Uganda

Project Location within Country:

Kampala

Professional Staff Provided by our Company:

Highway Engineer, Design Engineer, Surveyor, Materials Engineer, Hydrologist, , Administrators

Name of Client:

Kampala Capital City Authority 

No. of staff:

10

Address of Client:

P.O.Box 7010 Kampala Uganda

No. of Man - Months:

4

Start Date (month/year)

March 2015

Completion Date (month/year)

July 10, 2015

Approx. Value of Services/Financing Agency:

UGX  356,112,000

Names of Associated Firm(s) if any:

None

No. of Man-Months of Professional Staff Provided by Associated Firm(s):

N/A

Positions of senior staff involved:

  • Highway Engineer-PJ 
  • Design Engineer-Ronald Kibuuka 
  • Surveyor-Mr. Musungu 
  • Materials Engineer-Eng. Asnake Abate 
  • Hydrologist-Eng. Yiga lawrence

Detailed Narrative Description of Project:

The scope of works under the project largely involve upgrading of existing road from gravel to bitumen standards with the following major activities:
  • Feasibility study report 
  • Engineering design report 
  • Bidding documents 
  • Unit rate analysis and confidential Engineer’s estimate..

Detailed Description of Actual Services provided by our Company:

  • Preparation of Feasibility study report 
  • Preparation of Engineering design report 
  • Preparation of Bidding documents 
  • Preparation of Unit rate analysis and confidential Engineer’s estimate.