Design and Build for Upgrading of Mubende-Kakumiro-Kagadi Road (107 Km)

Project Name:

Design and Build for Upgrading of Mubende-Kakumiro-Kagadi Road (107 Km)

Country:

UGANDA

Project Location within Country:

Kibaale District

Professional Staff Provided by your Company:

Team Leader/Senior Highway Engineer, Architect, Urban Planner, Hydrologist, Water Sanitation Engineer, Land Surveyor, Environmentalist, Quantity Surveyor, Economist, Materials Specialist, Electrical Engineer, Sociologist, Valuation  Surveyor

Name of Client:

Ministry of Lands, Housing and Urban Development

No. of staff:

21

Address of Client:

24847 Kampala Uganda 

Duration of Assignment:

36 Months

Start Date (month / year)

3 March 2016

Completion Date (month / year)

ongoing 

Approx. Value of Services / Financing Agency:

USD 1,302,822 

Names of Associated Firm(s) if any:

AIC Progetti

No. of Man-Months of Professional Staff Provided by Associated Firm(s):


Positions of senior staff involved:

  • Team Leader: Eng. Eng Lemma Temesgen 
  • Architect, Jonathan Nsubuga 
  • Urban Planner, Dr. C. Koojo 
  • Hydrologist, Max Kigobe
  • Water Sanitation Engineer, Eng. L. Yiga 
  • Land Surveyor, JohnMusungu 
  • Environmentalist, Kajubi Lameck 
  • Quantity Surveyor, Simon Nyanzi 
  • Economist, Lameck Kajubi 
  • Materials Specialist,Fisseha Kebede  
  • Electrical Engineer, SSsentongo 
  • Sociologist, Rebecca Kisamba Mugerwa  
  • Valuation Surveyor, Solomon Balinda

Detailed Narrative Description of project:

The design and build project of Mubende-Kakumiro-Kagadi (107 km) involves the detailed engineering design and upgrading of the existing gravel road to bitumen standards with the following pavement structure; AC-wearing Course, CRR-base and natural G30 gravel subbase.


Detailed Description of Actual Services provided by your company:

  • Review and approval of designs prepared by the Contractor;
  • General contract administration, measurement and certification of works for payment, cost control and preparation of Variation Orders;
  • Monitoring the Public Health issues on the project;
  • Environmental Monitoring;
  • Supervision of the Civil works;
  • Guiding the setting out of works and controlling levels on the project; and
  • Checking the quality of works and materials to be incorporated in the permanent works.
    .
More from this author: