Construction Supervision Of The Kampala Northern Bypass

Project Name:

Construction Supervision Of The Kampala Northern Bypass

Country:

Uganda

Project Location within Country:

Kampala

Professional Staff Provided by your Company:

Deputy Resident Engineer/Measurement Engineer, Public Health Specialist, Environmentalist, Senior Surveyor, Electrical Engineer and all 14 support staff (inspectors, laboratory technicians, CAD technician, survey assistants and Administrative staff)

Name of Client:

Ministry of Works, Housing and Communications/Uganda National Roads Authority

No. of staff:

19

Address of Client:

Plot H Yusuf Lule Road, P.O. Box 28487, Kampala

No. of Man – Months:

426

Start Date (month / year)

20th May 2004

Completion Date (month / year)

Still on-going

Approx. Value of Services / Financing Agency:

Ushs 4,349,452,234, financed by EU

Names of Associated Firm(s) if any:

BCEOM French Engineering Consultants

No. of Man-Months of Professional Staff Provided by Associated Firm(s):

76.5

Positions of senior staff involved:

  • Resident Engineer – Nigel Curtin
  • Measurement Engineer – Charles Bakaki
  • Public Health Specialist – Freddie P. Ssengooba
  • Environmentalist – Charles Koojo
  • Electrical Engineer – John Sewanyana
  • Surveyor – Vincent Mugumya

Detailed Narrative Description of project:

Project involves the design review and supervision of the construction of 21 Km of an urban Bypass to the Northern side of Kampala City with 9 bridges, 6 round abouts and 2 interchanges. The road, which is on a completely new alignment is to be dualled for the 1st 3.5 Km and then a single carriageway for the remaining 17.5 km (with a provision for dualling in the future

Detailed Description of Actual Services provided by your company:

  • General contract administration, measurement and certification of works for payment, cost control and preparation of Variation Orders
  • Monitoring the Public health issues on the project
  • Environmental Monitoring
  • Supervision of the Civil and Electrical works
  • Guiding the setting out of works and controlling levels on the project
  • Checking the quality of works and materials to be incorporated in the permanent works